Project Name: Yogobonny frozen yogurt kiosk
Project Location: Airport Outlet Center – Istanbul / Bakirkoy
Project – Design Start Date: 10/03/2015
Project – Design End Date: 10/04/2015
Project – Manufacturing Start Date: 30/04/2015
Project – Manufacturing End Date: 14/06/2015
Project Design Duration: 30 days
Project Manufacturing Duration: 45 days
Project Amount: 16,500 Euros – Including installation and transportation.
Main Materials Used: GlossMax Acrylic laminated MDF, Break-resistant reinforced tempered 8mm glass, Plexiglass and UV visual coatings, Single-digit lock system, Remote-controlled and divided lighting system, High-level electrical and furniture craftsmanship.
Note: Shipping costs for our manufacturing outside of Turkey are borne by the customer. Additionally, crate packaging fees are reflected in the manufacturing cost based on international standards.