Project Name: Mavi Program
Project Location: Tepe Natilius Shopping Mall – Istanbul / Kadikoy
Project – Design Start Date: 02/01/2015
Project – Design End Date: 10/01/2015
Project – Manufacturing Start Date: 15/01/2015
Project – Manufacturing End Date: 25/01/2015
Project Design Duration: 8 days
Project Manufacturing Duration: 40 days
Project Amount: 16,000 Euros – Including installation and transportation.
Main Materials Used: GlossMax Acrylic laminated MDF, Break-resistant reinforced tempered 8mm glass, Plexiglass and UV visual coatings, Single-digit lock system, Remote-controlled and divided lighting system, High-level electrical and furniture craftsmanship.
Note: Shipping costs for our manufacturing outside of Turkey are borne by the customer. Additionally, crate packaging fees are reflected in the manufacturing cost based on international standards.