



Project Name: MarinTurk City Port
Project Location: MarinTurk City Port – Istanbul / Pendik
Project – Design Start Date: 12/05/2013
Project – Design End Date: 19/05/2013
Project – Manufacturing Start Date: 10/06/2013
Project – Manufacturing End Date: 10/07/2013
Project Design Duration: 7 days
Project Manufacturing Duration: 30 days
Project Amount: 14,000 Euros – Including installation and transportation.
Main Materials Used: GlossMax Acrylic laminated MDF, Break-resistant reinforced tempered 8mm glass, Plexiglass and UV visual coatings, Single-digit lock system, Remote-controlled and divided lighting system, High-level electrical and furniture craftsmanship.
Note: Shipping costs for our manufacturing outside of Turkey are borne by the customer. Additionally, crate packaging fees are reflected in the manufacturing cost based on international standards.