Project Name: PROJECT SMARTPUNKT 01
Project Location: CANO CENTER Shopping Mall – FREIBURG/ GERMANY
Project – Design Start Date: 12/08/2021
Project – Design End Date: 21/08/2021
Project – Manufacturing Start Date: 25/08/2021
Project – Manufacturing End Date: 05/10/2021
Project Design Duration: 15 days
Project Manufacturing Duration: 45 days
Project Amount: 16,000 Euros ( EXWORKS DELIVERY )
Main Materials Used: GlossMax Acrylic laminated MDF, Break-resistant reinforced tempered 8mm glass, Plexiglass and UV visual coatings, Single-digit lock system, Remote-controlled and divided lighting system, High-level electrical and furniture craftsmanship.
Note: Shipping costs for our manufacturing outside of Turkey are borne by the customer. Additionally, crate packaging fees are reflected in the manufacturing cost based on international standards.