Project Name: SMARTPUNKT MALL KIOSK
Project Location: Ettlinger Tor Einkaufcentrum – Karlsruhe Deutschland
Project – Design Start Date: 23/03/2022
Project – Design End Date: 30/03/2022
Project – Manufacturing Start Date: 01/04/2022
Project – Manufacturing End Date: 13/06/2022
Project Design Duration: 7 days
Project Manufacturing Duration: 42 days
Project Amount: 16,000 Euros – exworks

Main Materials Used: GlossMax Acrylic laminated MDF, Break-resistant reinforced tempered 8mm glass, Plexiglass and UV visual coatings, Single-digit lock system, Remote-controlled and divided lighting system, High-level electrical and furniture craftsmanship.

Note: Shipping costs for our manufacturing outside of Turkey are borne by the customer. Additionally, crate packaging fees are reflected in the manufacturing cost based on international standards.