Project Name: Emaar Square Coffe Booth
Project Location: Emaar Square Shopping Mall – Istanbul / Göztepe
Project – Design Start Date: 20/03/2021
Project – Design End Date: 01/04/2021
Project – Manufacturing Start Date: 01/04/2021
Project – Manufacturing End Date: 01/06/2021
Project Design Duration: 20 days
Project Manufacturing Duration: 60 days
Project Amount: 75,000 Euros – Including installation and transportation.
Main Materials Used: Laser cut 1mm DKP, electrostatic powder coating, HighGloss Acrylic laminated MDF, Laser Cut acrylic signs, Break-resistant reinforced tempered 8mm glass, Water Resistant Wood, Plexiglass and UV visual coatings, Single-digit lock system, Foil coating application, Fire extinguishing system, Remote-controlled and divided lighting system, Automatic remote control Shutter, High-level electrical and furniture craftsmanship, backlighted LED Sign System, Light Box powered with LED, CNC router supported production with professional design software.
Note: Shipping costs for our manufacturing outside of Turkey are borne by the customer. Additionally, crate packaging fees are reflected in the manufacturing cost based on international standards.