Whatsapp : 00905322833010 info@standchi.com

Project Name: D&P PERFUMUM
Project Location: Can Park Shopping Mall – Istanbul / Umraniye
Project – Design Start Date: 20/09/2020
Project – Design End Date: 30/09/2020
Project – Manufacturing Start Date: 10/10/2020
Project – Manufacturing End Date: 20/11/2020
Project Design Duration: 10 days
Project Manufacturing Duration: 40 days
Project Amount: 12,500 Euros – Including installation and transportation.

Main Materials Used: HighGloss Acrylic laminated MDF, Laser Cut acrylic signs, Break-resistant reinforced tempered 8mm glass, Plexiglass and UV visual coatings, Single-digit lock system, Foil coating application, Remote-controlled and divided lighting system, High-level electrical and furniture craftsmanship, backlighted LED Sign System, Light Box powered with LED, CNC router supported production with professional design software.

Note: Shipping costs for our manufacturing outside of Turkey are borne by the customer. Additionally, crate packaging fees are reflected in the manufacturing cost based on international standards.