Project Name: Bulgurcum
Project Location: CNR EXPO Exhibition Center – Istanbul / Bakirkoy
Project – Design Start Date: 12/08/2017
Project – Design End Date: 22/08/2017
Project – Manufacturing Start Date: 01/09/2017
Project – Manufacturing End Date: 11/10/2017
Project Design Duration: 10 days
Project Manufacturing Duration: 40 days
Project Amount: 14,000 Euros – Including installation and transportation.
Main Materials Used: GlossMax Acrylic laminated MDF, Break-resistant reinforced tempered 8mm glass, Plexiglass and UV visual coatings, Single-digit lock system, Remote-controlled and divided lighting system, High-level electrical and furniture craftsmanship.
Note: Shipping costs for our manufacturing outside of Turkey are borne by the customer. Additionally, crate packaging fees are reflected in the manufacturing cost based on international standards.