Whatsapp : 00905322833010 info@standchi.com

Gallery of Manufactured Stands

 

 

PROJECT BULGURCUM

Project Name: Bulgurcum
Project Location: CNR EXPO Exhibition Center – Istanbul / Bakirkoy
Project – Design Start Date: 12/08/2017
Project – Design End Date: 22/08/2017
Project – Manufacturing Start Date: 01/09/2017
Project – Manufacturing End Date: 11/10/2017
Project Design Duration: 10 days
Project Manufacturing Duration: 40 days
Project Amount: 14,000 Euros – Including installation and transportation.

Main Materials Used: GlossMax Acrylic laminated MDF, Break-resistant reinforced tempered 8mm glass, Plexiglass and UV visual coatings, Single-digit lock system, Remote-controlled and divided lighting system, High-level electrical and furniture craftsmanship.

Note: Shipping costs for our manufacturing outside of Turkey are borne by the customer. Additionally, crate packaging fees are reflected in the manufacturing cost based on international standards.

PROJECT BRITISH COUNCIL

Project Name: BRITISH COUNCIL
Project Location: Lutfi Kirdar – Istanbul / TAKSIM
Project – Design Start Date: 11/06/2017
Project – Design End Date: 19/06/2017
Project – Manufacturing Start Date: 21/06/2017
Project – Manufacturing End Date: 25/07/2017
Project Design Duration: 8 days
Project Manufacturing Duration: 35 days
Project Amount: 11,000 Euros – Including installation and transportation.

Main Materials Used: Standart MDF, Aluminium profiles, Plexiglass and foil, Bar Chairs, BackLighted Sign lighting system, High-level electrical and furniture craftsmanship.

Note: Shipping costs for our manufacturing outside of Turkey are borne by the customer. Additionally, crate packaging fees are reflected in the manufacturing cost based on international standards.

PROJECT D&P PERFUMUM – CANPARK MALL

Project Name: D&P PERFUMUM
Project Location: Can Park Shopping Mall – Istanbul / Umraniye
Project – Design Start Date: 20/09/2020
Project – Design End Date: 30/09/2020
Project – Manufacturing Start Date: 10/10/2020
Project – Manufacturing End Date: 20/11/2020
Project Design Duration: 10 days
Project Manufacturing Duration: 40 days
Project Amount: 12,500 Euros – Including installation and transportation.

Main Materials Used: HighGloss Acrylic laminated MDF, Laser Cut acrylic signs, Break-resistant reinforced tempered 8mm glass, Plexiglass and UV visual coatings, Single-digit lock system, Foil coating application, Remote-controlled and divided lighting system, High-level electrical and furniture craftsmanship, backlighted LED Sign System, Light Box powered with LED, CNC router supported production with professional design software.

Note: Shipping costs for our manufacturing outside of Turkey are borne by the customer. Additionally, crate packaging fees are reflected in the manufacturing cost based on international standards.

PROJECT EMAAR SQUARE

Project Name: Emaar Square Coffe Booth
Project Location: Emaar Square Shopping Mall – Istanbul / Göztepe
Project – Design Start Date: 20/03/2021
Project – Design End Date: 01/04/2021
Project – Manufacturing Start Date: 01/04/2021
Project – Manufacturing End Date: 01/06/2021
Project Design Duration: 20 days
Project Manufacturing Duration: 60 days
Project Amount: 75,000 Euros – Including installation and transportation.

Main Materials Used: Laser cut 1mm DKP, electrostatic powder coating, HighGloss Acrylic laminated MDF, Laser Cut acrylic signs, Break-resistant reinforced tempered 8mm glass, Water Resistant Wood, Plexiglass and UV visual coatings, Single-digit lock system, Foil coating application, Fire extinguishing system, Remote-controlled and divided lighting system, Automatic remote control Shutter, High-level electrical and furniture craftsmanship, backlighted LED Sign System, Light Box powered with LED, CNC router supported production with professional design software.

Note: Shipping costs for our manufacturing outside of Turkey are borne by the customer. Additionally, crate packaging fees are reflected in the manufacturing cost based on international standards.

PROJECT ERENGUL CICEKCILIK

Project Name: Erengul Cicekcilik
Project Location: Gebze Center Shopping Mall – Gebze / KOCAELI
Project – Design Start Date: 01/04/2016
Project – Design End Date: 10/04/2016
Project – Manufacturing Start Date: 10/04/2016
Project – Manufacturing End Date: 25/05/2016
Project Design Duration: 10 days
Project Manufacturing Duration: 45 days
Project Amount: 13,500 Euros – Including installation and transportation.

Main Materials Used: GlossMax Acrylic laminated MDF, Break-resistant reinforced tempered 8mm glass, Plexiglass and UV visual coatings, Single-digit lock system, Remote-controlled and divided lighting system, High-level electrical and furniture craftsmanship.

Note: Shipping costs for our manufacturing outside of Turkey are borne by the customer. Additionally, crate packaging fees are reflected in the manufacturing cost based on international standards.

PROJECT MARINTURK

Project Name: MarinTurk City Port
Project Location: MarinTurk City Port – Istanbul / Pendik
Project – Design Start Date: 12/05/2013
Project – Design End Date: 19/05/2013
Project – Manufacturing Start Date: 10/06/2013
Project – Manufacturing End Date: 10/07/2013
Project Design Duration: 7 days
Project Manufacturing Duration: 30 days
Project Amount: 14,000 Euros – Including installation and transportation.

Main Materials Used: GlossMax Acrylic laminated MDF, Break-resistant reinforced tempered 8mm glass, Plexiglass and UV visual coatings, Single-digit lock system, Remote-controlled and divided lighting system, High-level electrical and furniture craftsmanship.

Note: Shipping costs for our manufacturing outside of Turkey are borne by the customer. Additionally, crate packaging fees are reflected in the manufacturing cost based on international standards.

PROJECT MAVI PROGRAM

Project Name: Mavi Program
Project Location: Tepe Natilius Shopping Mall – Istanbul / Kadikoy
Project – Design Start Date: 02/01/2015
Project – Design End Date: 10/01/2015
Project – Manufacturing Start Date: 15/01/2015
Project – Manufacturing End Date: 25/01/2015
Project Design Duration: 8 days
Project Manufacturing Duration: 40 days
Project Amount: 16,000 Euros – Including installation and transportation.

Main Materials Used: GlossMax Acrylic laminated MDF, Break-resistant reinforced tempered 8mm glass, Plexiglass and UV visual coatings, Single-digit lock system, Remote-controlled and divided lighting system, High-level electrical and furniture craftsmanship.

Note: Shipping costs for our manufacturing outside of Turkey are borne by the customer. Additionally, crate packaging fees are reflected in the manufacturing cost based on international standards.

PROJECT MILK JUICE

Project Name: Milk Juice
Project Location: Exported to Jordan by Customers – EXW.
Project – Design Start Date: 04/09/2015
Project – Design End Date: 10/09/2015
Project – Manufacturing Start Date: 15/09/2015
Project – Manufacturing End Date: 25/10/2015
Project Design Duration: 6 days
Project Manufacturing Duration: 40 days
Project Amount: 11,000 Euros – Including installation and transportation.

Main Materials Used: GlossMax Acrylic laminated MDF, Break-resistant reinforced tempered 8mm glass, Plexiglass and UV visual coatings, Single-digit lock system, Remote-controlled and divided lighting system, High-level electrical and furniture craftsmanship.

Note: Shipping costs for our manufacturing outside of Turkey are borne by the customer. Additionally, crate packaging fees are reflected in the manufacturing cost based on international standards.

PROJECT MURANO

Project Name: Murano Glass Art
Project Location: Natilius Shopping Mall – Kadikoy / Istanbul
Project – Design Start Date: 04/03/2015
Project – Design End Date: 12/04/2015
Project – Manufacturing Start Date: 15/04/2015
Project – Manufacturing End Date: 25/05/2015
Project Design Duration: 8 days
Project Manufacturing Duration: 40 days
Project Amount: 13,500 Euros – Including installation and transportation.

Main Materials Used: GlossMax Acrylic laminated MDF, Break-resistant reinforced tempered 8mm glass, Plexiglass and UV visual coatings, Single-digit lock system, Remote-controlled and divided lighting system, High-level electrical and furniture craftsmanship.

Note: Shipping costs for our manufacturing outside of Turkey are borne by the customer. Additionally, crate packaging fees are reflected in the manufacturing cost based on international standards.