Project Name: Accessories World
Project Location: Maltepe Park Shopping Mall – Istanbul / Maltepe
Project – Design Start Date: 24/03/2023
Project – Design End Date: 10/04/2023
Project – Manufacturing Start Date: 11/04/2023
Project – Manufacturing End Date: 25/05/2023
Project Design Duration: 15 days
Project Manufacturing Duration: 45 days
Project Amount: 15,000 Euros – Including installation and transportation.
Main Materials Used: GlossMax Acrylic laminated MDF, Break-resistant reinforced tempered 8mm glass, Plexiglass and UV visual coatings, Single-digit lock system, Remote-controlled and divided lighting system, High-level electrical and furniture craftsmanship.
Note: Shipping costs for our manufacturing outside of Turkey are borne by the customer. Additionally, crate packaging fees are reflected in the manufacturing cost based on international standards.